Space Force reviewing bids for 10-year launch systems engineering contract

ManTech in 2010 acquired a 10-year contract for launch methods engineering and integration, and the job is now being re-competed.

WASHINGTON — Because the U.S. Area Pressure prepares to pick out launch suppliers later this yr for the nationwide safety area launch program, a separate effort is underway to select a contractor for the engineering and technical work that’s performed each day in assist of area launches.

ManTech is the present contractor for launch methods engineering and integration, or SE&I. The corporate in 2010 acquired a 10-year contract and the job is now being re-competed. The Area and Missile Techniques Middle’s launch enterprise is reviewing bids and can determine within the coming months whether or not to stick with the incumbent or change to a brand new contractor.

BAE Techniques is competing for the contract with a workforce that features LinQuest, Booz Allen Hamilton, a.i. options, Area Vector, Superior Core Ideas, VETS and GreenDart. The incumbent ManTech additionally has submitted a proposal.

ManTech’s 2010 contract expired in March. To bridge the hole till the subsequent contract, SMC awarded the corporate a six-month extension. The worth of the contract was redacted from paperwork posted April 2 on SAM.gov. The projected worth of the brand new 10-year contract additionally was redacted. In keeping with business sources, the SE&I contract might be price as a lot as $500 million.

The SE&I contract helps the SMC launch enterprise in Los Angeles in addition to the thirtieth Area Wing and the forty fifth Area Wing at Vandenberg Air Pressure Base, California, and Cape Canaveral Air Pressure Station, Florida, respectively. In keeping with SMC, the contractor will present “essential assist crucial to make sure profitable on-time launches in a brand new period of nationwide safety area launch.”

The paperwork posted on April 2 that justify the sixth-month extension say that planning for the transition to a brand new contractor has been difficult. The nationwide safety area launch program has gone by means of vital change in recent times, and SMC throughout the board has been reorganized, all of which led the launch enterprise to rethink the necessities for the SE&I contract.

“SMC has been creating necessities for this effort since November 2017,” mentioned the justification doc. The launch enterprise is in a “transitional section and creating necessities has confirmed tough.”

SMC is extending ManTech’s contract for six months to make sure continuity of service till a brand new contract is awarded. If a brand new vendor is chosen, the contract extension requires ManTech to assist prepare the employees from the incoming contractor.

The justification doc says the incumbent contractor has “the most effective perception on the operations of the present SMC/LE SE&I program … A brand new contractor wouldn’t have the institutional data associated to NSSL missions.”

The director of SMC’s launch enterprise Col. Rob Bongiovi instructed table4 in an announcement that SE&I proposals are at present being evaluated.

The ultimate request for proposals was issued in December 2019 and there was not sufficient time to make an award by March 2020, he mentioned. “A six-month extension was issued to keep away from break in service of SE&I assist and permit adequate time to award a follow-on SE&I-2 contract,” mentioned Bongiovi.

Recommended For You

Leave a Reply

Your email address will not be published.